Load and duty
State the rated load, dynamic duty, operating frequency and any synchronized-motion requirement.
Zhonghui Intelligent Manufacturing
Product / Stage lifting equipment
A selection hub for rigid-chain lifting systems used in theatre stages, orchestra pits, lift tables and matrix platforms. Load, travel, speed and synchronization are engineered per project.
Screen the series by load, travel and installation height, then confirm speed, duty cycle, synchronization and safety requirements with engineering.
| Model | Max. static load / travel | Max. dynamic load / travel | Rated speed | Minimum installation height | |
|---|---|---|---|---|---|
| 30A Rigid Lifting Chain | 10 kN / 1.2 m | 8 kN / 1.2 m | 150 mm/s | 200 mm | Full specifications → |
| 35A Rigid Lifting Chain | 12 kN / 1.5 m | 10 kN / 1.5 m | 200 mm/s | 226 mm | Full specifications → |
| 40A Rigid Lifting Chain | 40 kN / 2 m | 30 kN / 2 m | 300 mm/s | 370 mm | Full specifications → |
| 60A Rigid Lifting Chain | 90 kN / 2 m | 60 kN / 2 m | 300 mm/s | 450 mm | Full specifications → |
| 80A Rigid Lifting Chain | 130 kN / 2 m | 95 kN / 3 m | 300 mm/s | 550 mm | Full specifications → |
| 100A Rigid Lifting Chain | 200 kN / 3.5 m | 150 kN / 5 m | 300 mm/s | 650 mm | Full specifications → |
Series data below is referenced from Zhonghui Technology's public product archive. Final selection, interfaces and manufacturing data follow the drawing approved by Zhonghui Manufacturing.
Yes. Load capacity, travel, dimensions, control mode and installation envelope can be configured.
A selection hub for rigid-chain lifting systems used in theatre stages, orchestra pits, lift tables and matrix platforms. Load, travel, speed and synchronization are engineered per project. Stage machinery is engineered for each project. Share the following information so the product, installation conditions and control interface can be assessed together.
State the rated load, dynamic duty, operating frequency and any synchronized-motion requirement.
Provide available installation space, travel, platform dimensions and structural constraints.
Define speed, positioning accuracy, interlocks, emergency-stop logic and supervisory interfaces.
Confirm supply boundaries, installation, commissioning, documentation, training and acceptance requirements.